
Add to Cart
Mining Flotation Machine for Ore Processing Production Line
Introduction
Flotation machine can be used to separate nonferrous metal, ferrous metal, heavy metal, nonmetallic mine, chemical material such as gold, copper and recycling minerals. Each chute can inhale gas, sink magma, separate. No assiting equipments are required,and Flotation Machine must be levelly installed. Flotation Machine is easy to change the flow chart. The cycling way of magma is very reasonable. Flotation Machine can reduce the impurities to a great extent. There is automatic equipment on the magma surface, easy to adjust. The impeller also owns the upper and lower retroversion blade. The upper one makes the magma cycle upward, while the lower one makes the magma cycle downward.
Features
XJ flotation machine is a widely used model introduced from the form Soviet Union with a long history. Currently, it is still widely applied in the grading of mines.
Parameter
Models | Effective volume of single cell | Inner dimensions of cell | Handling capacity | Spindle motor | Single cell weight | |
Models | Power | |||||
m³ | mm | m³/min | kw | kg | ||
XJ-1.1 | 1.1 | 1100×1100×1000 | 0.6-1.6 | Y132M2-6 | 5.5 | 1450 |
XJ-2.8 | 2.8 | 1750×1600×1100 | 1.5-3.5 | Y160L-6 | 11 | 2340 |
XJ-5.8 | 5.8 | 2200×2200×1200 | 3.0-7.0 | Y200L2-6 | 22 | 3560 |
XJ-8 | 8 | 2600×2600×1300 | 4.0-8.5 | Y200L2-6/Y250M-8 | 22/30 | 4350 |
XJ-10 | 10 | 2900×2700×1400 | 5.0-10.0 | Y200L2-6/Y250M-8 | 22/30 | 4960 |
XJ-16 | 16 | 2400×3100×1600 | 8.0-13.5 | Y250M-8 | 30 | 8540 |
XJ-20 | 20 | 3600×3400×1700 | 10.0-17.0 | Y280S-8 | 37 |
8720
|
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.