
Add to Cart
Copper Ore, Gold Processing Equipment XJ Flotation Machine for Sale
Introduction
1. Large air-absorption capacity
2. Low energy consumption
3. Every cell owns three functions: air absorption, slurry absorption, and floatation separation, and the cells form a floatation separation loop by itself without any auxiliary equipment, and is allocated horizontally, which favors the change of flow.
4. The circulation of mineral slurry is reasonable, and can avoid the disposition of coarse sand to the largest extent.
5. There is self-control device on the surface of mineral slurry, so it is easy to adjust it.
6. The impeller has backward inclined upper and lower vanes, which produce upper and lower circulation of mineral slurry respectively.
Features
XJ flotation machine is a widely used model introduced from the form Soviet Union with a long history. Currently, it is still widely applied in the grading of mines.
Parameter
Models | Effective volume of single cell | Inner dimensions of cell | Handling capacity | Spindle motor | Single cell weight | |
Models | Power | |||||
m³ | mm | m³/min | kw | kg | ||
XJ-1.1 | 1.1 | 1100×1100×1000 | 0.6-1.6 | Y132M2-6 | 5.5 | 1450 |
XJ-2.8 | 2.8 | 1750×1600×1100 | 1.5-3.5 | Y160L-6 | 11 | 2340 |
XJ-5.8 | 5.8 | 2200×2200×1200 | 3.0-7.0 | Y200L2-6 | 22 | 3560 |
XJ-8 | 8 | 2600×2600×1300 | 4.0-8.5 | Y200L2-6/Y250M-8 | 22/30 | 4350 |
XJ-10 | 10 | 2900×2700×1400 | 5.0-10.0 | Y200L2-6/Y250M-8 | 22/30 | 4960 |
XJ-16 | 16 | 2400×3100×1600 | 8.0-13.5 | Y250M-8 | 30 | 8540 |
XJ-20 | 20 | 3600×3400×1700 | 10.0-17.0 | Y280S-8 | 37 | 8720 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.