Anhui Sinomining Machinery Co., Ltd

Y&X Beijing Technology Co.,Ltd.

Manufacturer from China
Active Member
5 Years
Home / Products / Mining Flotation Cell /

5.5kw Flotation Cell Mining Equipment , Copper Flotation Machine

Contact Now
Anhui Sinomining Machinery Co., Ltd
Country/Region:china
Contact Person:Lisa
Contact Now

5.5kw Flotation Cell Mining Equipment , Copper Flotation Machine

Ask Latest Price
Video Channel
Brand Name :Y&X
Model Number :XJ Flotation Machine
Certification :Quality Management System Cerification
Place of Origin :China
MOQ :1
Price :US$ 3000-10000 /per
Payment Terms :T/T
Delivery Time :30
Packaging Details :Standard Shipping Packaging
Name :XJ Flotation Machine
Application :Mineral Flotation Machine
Energy :Energy Saving
Effective Volume of Single Cell :1.10m³
Inner Dimensions of Cell :1100×1100×1000mm
Handling Capacity :0.6-1.6m³/min
Spindle Motor Power :5.5kw
Single Cell Weight :1450KG
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Key Flotation Equipment of Ore Dressing XJ Flotation Machine from China Mining Machine Manufacturer

Introduction
Flotation machine is applicable to grading of non-ferrous and ferrous metal, also applicable to grading of nonmetals, such as coal, fluorite and talc. The impeller of flotation machine is driven by motor v-belt, centrifugal effect is thus produced and negative pressure is formed, which, on the one hand, absorbs adequate air to mix with ore pulp, and on the other hand, stirs the ore pulp and mixes the ore pulp with medicines and refine bubbles; thus, the minerals will be adhered to the bubbles and float to the pulp surface and form foam layer. Adjust the opening of flash board and cone valve and control the liquid level to make the useful bubbles scraped out by scraper blade. For selection of flotation machines, the following information shall be indicated: Models, specifications and number of flotation cells. Number of scraper blade devices (left or right). Single-side scraping or double-side scraping. Numbers of feed boxes, middling boxes, tailing boxes, feed pipes and middling pipes. Liquid level can be controlled manually, electrically or automatically. Deployment diagram of flotation technological process should be provided.

Features
XJ flotation machine is a widely used model introduced from the form Soviet Union with a long history. Currently, it is still widely applied in the grading of mines.

Advantages
The Floatation Machine has the advantages of large air-absorption capacity and low energy consumption. Every cell owns
Three functions: Air absorption, slurry absorption, and floatation separation, and the cells form a floatation separation loop
By itself without any auxiliary equipment, and is allocated horizontally, which favors the change of flow. The circulation of
Mineral slurry is reasonable, and can avoid the disposition of coarse sand to the largest extent. There is self-control device
On the surface of mineral slurry, so it is easy to adjust it. The impeller has backward-inclined upper and lower vanes, which
Produce upper and lower circulation of mineral slurrry respectively.


Parameter

Models Effective volume of single cell Inner dimensions of cell Handling capacity Spindle motor Single cell weight
Models Power
mm m³/min kw kg
XJ-1.1 1.1 1100×1100×1000 0.6-1.6 Y132M2-6 5.5 1450
XJ-2.8 2.8 1750×1600×1100 1.5-3.5 Y160L-6 11 2340
XJ-5.8 5.8 2200×2200×1200 3.0-7.0 Y200L2-6 22 3560
XJ-8 8 2600×2600×1300 4.0-8.5 Y200L2-6/Y250M-8 22/30 4350
XJ-10 10 2900×2700×1400 5.0-10.0 Y200L2-6/Y250M-8 22/30 4960
XJ-16 16 2400×3100×1600 8.0-13.5 Y250M-8 30 8540
XJ-20 20 3600×3400×1700 10.0-17.0 Y280S-8 37

8720

Why choose our company machine?


Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.

Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.

Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.

Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.

Inquiry Cart 0