
Add to Cart
Hot Sale Mining Mixing Equipment Agent Agitation Tank for Mines
Introduction
Mixing bucket, agitation barrels, mixing tanks, mixing barrels, are used for mixing pulp before the floatation process, makes the pulp and medicament mixed intensively, and creates condition for the ore beneficiation working.
Feature
Suitable for common agitation tank in the dressing plants for agent agitation. The unique design of impeller leads to uniform agitation and good mixing effects.
Parameter
Models and specifications | Dimensions of cell | Effective volume | Impeller | Motor models |
Overall dimensions (L x W x H) |
Weight | |||
Diameter | Height | Diameter | Rotating speed | Models | Power | ||||
mm | mm | m³ | mm | r/min | kw | mm | kg | ||
RJW-1000 | 1000 | 1000 | 0.7 | 250 | 535/458 | Y90S-4/Y90S-4 | 1.1/1.1 | 1162×1250×1678 | 489 |
RJW-1250 | 1250 | 1250 | 1.4 | 312.5 | 428/367 | Y90L4/Y90S-4 | 1.5/1.1 | 1459×1350×1930 | 607 |
RJW-1500 | 1500 | 1500 | 2.8 | 400 | 334/286 | Y112M-6/Y100L-6 | 2.2/1.5 | 1812×1730×2425 | 1076 |
RJW-2000 | 2000 | 2000 | 5.6 | 500 | 267/229 | Y132M1-6/Y112M6 | 4/2.2 | 2244×2200×2978 | 2051 |
RJW-2500 | 2500 | 2500 | 11.2 | 625 | 214/183 | Y160M-6/Y132M1-6 | 7.5/4 | 2914×2600×3576 | 3029 |
RJW-3000 | 3000 | 3000 | 22 | 788 | 170/145 | Y180L-8/Y160L-8 | 11/7.5 | 3608×3300×4240 | 4010 |
RJW-3500 | 3500 | 3500 | 31.5 | 888 | 151/129 | Y200L-8/Y180L-8 | 15/11 | 4030×3780×4770 | 6540 |
RJW-4000 | 4000 | 4000 | 45 | 1000 | 134/115 | Y225S-8/Y200L-8 | 18.5/15 | 4490×4190×5219 | 8083 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.