
Add to Cart
Professional Beneficiation Production Line for Mining Plant
Application
It is used for the separation of rare metals, non-ferrous metals and non-metallic ores
Product advantages
High efficiency, low energy, high-capacity, economic rationality
Features
High efficiency, low energy, high-capacity, economic rationality
Operation Principle
It is mainly composed of jaw crusher, ball mill, classifier, magnetic separator, flotation machine, thickener and dryer. It can form a complete beneficiation production line with feeder, elevator and conveyor. The mined ore is initially crushed by jaw crusher. After crushing to a reasonable fineness, it is evenly sent to ball mill through elevator and feeder. The ore is crushed and grinded by ball mill. The fine ore grinded by ball mill enters the next process: classification. The spiral classifier uses the principle of different sedimentation speed in liquid due to different specific gravity of solid particles, The ore mixture is cleaned and graded. When the cleaned and graded mineral mixture passes through the magnetic separator, the magnetic material in the mixture is separated by magnetic force and mechanical force due to the different specific magnetic coefficients of various minerals. The mineral particles preliminarily separated by the magnetic separator are sent to the flotation machine, and different drugs are added according to different mineral characteristics, After the mineral is separated, because it contains a lot of water, it must be initially concentrated by a thickener, and then dried by a dryer to get the dry mineral.
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.