
Add to Cart
Linear Vibrating Screen Mining Materials Screen Copper Dressing Process Sieve
Introduction
The linear screen (linear vibrating screen) uses a vibration motor as the source of vibration, so that the material is thrown up on the screen while moving forward in a straight line, and the material enters the inlet of the screener evenly from the feeder and passes through the multi-layer screen. The net produces several specifications of oversieve and undersieve, which are respectively discharged from their respective outlets. It has low energy consumption, high output, simple structure, easy maintenance, fully enclosed structure, no dust spillage, automatic discharge, and is more suitable for assembly line operations.
Feature
1. This type of screening machine is suitable for high-capacity coarse separation operations;
2. The material has a long stroke on the screen surface and a large processing capacity;
3. Parallel conveying of materials while screening;
4. The inclination of the screen surface can be adjusted to balance the throughput of the screen accuracy.
Parameter
Models | Screening area (m2) | Amplitude (mm) | Motor Models | Motor power (kw) | Rotating speed (r.p.m) |
DZS0410 | 0.4×1.0 | 2~4 | YZS3-6 | 0.25 | 970 |
DZS0412 | 0.4×1.2 | ||||
DZS0415 | 0.4×1.5 | ||||
DZS0612 | 0.6×1.2 | ||||
DZS0718 | 0.7×1.8 | YZO-10-6 | 0.75 | 960 | |
DZS0816 | 0.8×1.6 | ||||
DZS0918 | 0.9×1.8 | ||||
DZS1018 | 1.0×1.8 | YZO-16-6 | 1.1 | 950 | |
DZS1020 | 1.0×2.0 | 3~5 | YZO-20-6 | 2 | |
DZS1225 | 1.25×1.25 | ||||
DZS1530 | 1.5×3.0 | ZDS41-6 | 3 | 940 | |
DZS21530 | 1.5×3.0 | 950 | |||
DZS1536 | 1.5×3.6 | 940 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.