
Add to Cart
Introduction
PF series of equipment includes secondary and tertiary impact plate which can handle the materials less than 100-800mm in the length.It is suitable to crush the medium hard material with compressive resistance of 350Mpa. The discharging from impact crusher is small and fine granularity of cubic shape.
Features
When the impact crusher is working, driving by the motor, the rotor rotates at a high speed, and materials obtain huge kinetic energy in the impact process; when materials enter into the active region of board hammer, they collide with the board hammer and are crushed; then, they are thrown to the counterattack plate with a high speed and crushed again; finally, the materials return to the active region of board hammer after being rebounded by the counterattack plate for crushing again. The crushing process is repeated for several times, and materials enter into the I, II, III counterattack cavity and are crushed repeatedly until they are discharged from the discharge hole at the bottom of the crusher after being crushed to the required particle sizes.
Parameter
Models |
Specifications (mm) |
Feed inlet size (mm) |
Max. feed inlet size (mm) |
Handling capacity (t/h) |
Motor power (kw) |
Weight (t) |
PF-1007 | Φ1000X700 | 400X730 | 250 | 15-60 | 37-55 | 9.5 |
PF-1010 | Φ1000X1050 | 400X1080 | 300 | 50-90 | 55-75 | 14 |
PF-1210 | Φ1250X1050 | 400X1080 | 300 | 70-130 | 110-132 | 17 |
PF-1214 | Φ1250X1400 | 400X1430 | 300 | 90-180 | 132-160 | 22 |
PF-1315 | Φ1320X1500 | 860X1520 | 350 | 120-250 | 180-260 | 26 |
PF-1320 | Φ1320X2000 | 860X2030 | 500 | 160-350 | 300-375 | 30 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.