Mining Concentrator Thickener For Beneficiation Processing
Introduction
Concentrator is generally used for concentrate concentration and dehydration of tailings before filtration in dress plants to concentrate the ore pulp with concentration of 20-30% to concentration of 40-70%. It is widely used for concentration and purification of slurry containing solid materials in industries of ore dressing, metallurgy, chemical industry, coal, construction materials, and source water and wastewater treatment, etc.
Features
NZT concentrator is a large peripheral transmission, central rake-lifting, high-efficiency concentrator, which is mainly used for the concentration of concentrate pulp and tailing pulp. It has simple structure, large torque and high degree of standardization. Intelligent control is adopted for detecting running resistance randomly and adjusting operating state. It can realize stepless speed regulating (hydraulic or frequency conversion) to adapt to ore pulp operation with different concentration and specific gravity.
Parameter
Models | Diameter of concentration tank | Depth at the tank center | Sediment area | Time/revolution for rake | Transmission power | Rake-lifting power | Height of rake-lifting |
m | m | m2 | min/r | kw | kw | mm | |
NZT-38 | 38 | 4.5 ~ 7 | 1134 | 10-25 | 11 | 4 | 600 |
NZT-45 | 45 | 5 ~ 7.5 | 1590 | 12-26 | 15 | 4 | 600 |
NZT-53 | 53 | 5 ~ 8 | 2206 | 15-30 | 15 | 5.5 | 700 |
NZT-65 | 65 | 5.5 ~ 8.5 | 3318 | 15-35 | 18.2 | 5.5 | 800 |
NZT-75 | 75 | 6 ~ 9 | 4417 | 20-40 | 22 | 7.5 | 800 |
NZT-80 | 80 | 6.5 ~ 10 | 5026 | 20-50 | 30 | 7.5 | 900 |
NZT-100 | 100 | 7 ~ 11 | 7854 | 25-80 | 37 | 11 | 1000 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine. Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your company provide spare parts?
Answer: The warranty period of our machine is one year. For those wearing parts, we guarantee to provide high-quality parts for a long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance payment. Small machine is guaranteed to be delivered within one month. Large-scale machine is guaranteed to be delivered within 2-3 months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation, commissioning and operation guidance.